DALRYMPLE BAY COAL TERMINAL 7X EXPANSION PROJECT– UPGRADES TO CONVEYOR R4

 

CONTRACT VALUE     $6M                                                                       
YEAR                         2007

 

McFee were commissioned by Babcock and Brown Infrastructure (BBI) to complete upgrades to conveyor R4 for the Dalrymple Bay Coal Terminal Expansion Project to handle increased throughput as part of the 7X Project. 


The upgrades covered the supply, installation and commissioning of various mechanical, civil, structural and electrical works, under the direction of Connell Hatch, acting as the EPCM representative for BBI.

 

Contract Scope

 

Structural

  • Fabrication, supply and installation of tail frame assembly, brake station and transfer tower upgrades
  • Removal and replacement of chute work to allow for new 3-way diverter system

Mechanical

  • Removal of existing and installation of new conveyor drive and brake systems
  • Supply and installation of belt idler rollers, pulleys, and belt wash system
  • Belt splicing and adjustment to gravity take-up

Piping

  • Fabricate, supply and installation of pipe and drain work.

Electrical, Control and Communications

  • Removal and reinstatement of electrical items to allow for tower upgrades
  • New cabling and racking to new drives and mechanical equipment
  • Installation of new telemetry cabling, boxes, and starters cells

Commissioning

  • Commissioning of new 3-way diverter chute system
  • Commissioning of new telemetry and conveyor system.

Key Elements    

  • Brown field environment
  • Shutdown and operational constraints
  • Interaction with other stakeholders
  • Coordination of offsite and onsite subcontractors

 

 

 

ERA RANGER URANIUM MINE – RADIOMETRIC SORTER & LATERITE PROJECTS

 

CONTRACT VALUE          $8M 
YEAR                              2007

 

located 230 km East of Darwin, Ranger Uranium Mine operated by Energy Resources of Australia, a 68% subsidiary of Rio Tinto Group is currently undergoing an expansion to its ore processing plant including the installation of a new Laterite processing facility.


The expansion will allow production to extend into lower-grade material and allow it to process ore with a high clay content that has been stockpiled since the mine began operating in 1980.

 

McFee’s Scope of Work generally covers the supply, installation and commissioning resources for the new Radiometric Sorter and new Laterite Treatment Plant under the direction of SNC-Lavalin.

 

Contract Scope

 

Structural

  • Fabrication, supply and installation of  support steelwork, conveyor gantries, including stringers, walkways, spillage underpans and cladding
  • Supply and install of tank stiffening steelwork

Mechanical

  • Installation of conveyor systems, scrubbing equipment, pump sets, hoists, fans, compressed air system
  • Installation of radiometric ore sorter and ball mill
  • Installation of feed hoppers and discharge chute work
  • Installation of tanks and tank agitators

Piping

  • Fabricate, supply and installation of duct work
  • Installation of concrete culvert and associated pipelines
  • Supply and install polyethylene and galvanised process lines

Commissioning

  • Labour for commissioning of all systems

Key Elements    

  • Location constraints
  • Safety and Environmental Management
  • Coordination of offsite and onsite subcontractors

 

 

 

BENDIGO MINING LTD
BENDIGO GOLD PROJECT

 

CONTRACT VALUE          $13M
YEAR                              2006

 

The Bendigo Gold Project situated at Bendigo in central Victoria, Australia, designed to treat 600,000 tpa of ore. The processing facilities include crushing, grinding, gravity, flotation, leaching, electrowinning, thickening and gold room operations.

 

Contract Scope

 

Structural
  • Crusher Buildings
  • Ore Bins
  • Screening Buildings
  • Floatation Buildings
  • Thickener

 

Mechanical

  • Primary Crusher Installation
  • Secondary Crusher Installation
  • Feed Conveyor Installation
  • Ore Screens
  • Mill Pumps
  • Concentrate Pumps

Piping

  • Process Piping
  • Raw Water Piping
  • Plant Air Piping
  • Leach Acid Piping

Tanks

  • Raw Water tanks
  • Acid Tanks
  • Process Tanks

Commissioning

  • Labour for commissioning of all systems

Key Elements 

   

  • Safety and Environmental Management

 

 

 

WINDIMURRA VANADIUM

PROCESS PLANT CONSTRUCTION

 

CONTRACT VALUE           $32M
YEAR                              2008

 

Located 70 km East of Mt Magnet which is again East of Geraldton WA
Windimurra Vanadium is constructing a mine and Processing Plant at the site.

 

Contract Scope

McFee’s scope of work generally covers the supply and installation of SMP infrastructure for the Vanadium Processing Plant and includes the following works.

 

Piping Works


Magnetite Feed
Cooling water

Fire Water

Roasting

Nitrogen

Potable Water

Leaching

Instrument Air

Plant Air

Sulphuric Acid

Natural Gas

General Process Lines

 

Tanks


Leach Storage Tanks

Aluminium Sulphate Tanks

Desilication Tanks

Sulphuric Acid Tanks

Precipitation Tanks

AMSUL Mixing tanks

Filter Tanks

Dosing Tanks

 

Steel works


Pipe/Cable Rack

Precipitation and Filtration

Roasting

Magnetite Feed

Flash Dryer

Leaching

Soda Ash Addition

V2O5 Production Facility

Flaking Area

Desilication

 

FeV Production Facility

 

Plate works


Magnetite Feed

Roasting

Leaching

Flash Dryer

V2O5Production Facility

V2O2 Production Facility

 

Mechanical works


Magnetite Feed

Leaching

Flash Dryer

Roasting

AMV Precipitation and Filtration

FeV Production Facility

V2O3 Production Facility

Plant Services

 

 

Key Elements


Supply and Install contract

 

 

 

BMA BLACKWATER COAL FACILITY
CONVEYOR & PROCESS CONSTRUCTION

 

CONTRACT VALUE           $20M
YEAR                              2006

 

Contract Scope

 

McFee was contracted by Barclay Mowlem/ Laing O’Rourke in December 2005 to erect conveyor 304 from the circular stacker to the CHPP which included emergency vibe feeder & associated chutes. The 304 conveyor commenced approx 50mts inside the reclaim tunnel.

 

The 304 conveyor was completed ahead of planned schedule McFee was engaged to erect 301 conveyor & also Crushing station. The crusher building had 6 levels with MMD secondary & tertiary crushers along with roller screens & shuttle conveyors all ITP’s, & MDR’s were completed for all areas.

 

While on site McFee was awarded 2 safety awards one was no medical treatment injuries in 11 months while engaged on the project up to 80 personnel onsite.

 

Key Elements    

  • Location constraints
  • Safety and Environmental Management

 

 

 

ALCAN GOVE
PROCESS PLANT EXPANSION

 

CONTRACT VALUE           $30M
YEAR                               2008

 

Located on the western side of the Gulf of Carpentaria the Gove alumina refinery is operated by Alcan.


The Project was to work with the client to complete a range of SMP works for expansion within the Brownfield site.

 

Contract Scope

 

McFee’s scope of work generally covers the supply and installation of SMP infrastructure for the Alumina Processing Plant and includes the following works:

 

Structural
  • Fabrication, supply and installation of general structural steelwork for Powder Floc, Coarse Seed and Washer buildings.
  • Floc Mixing Tanks
  • Reslury Tanks
  • Feed Systems Tanks
Mechanical
  • Lobster Pot and  Disc Filters
  • Coarse seed Pumps
  • HP Water pumps
  • Washer Sump Pumps
  • 10 Tonne Crane
Piping
  • Utility Air piping
  • Instrument Air piping
  • Sump pump discharge piping
  • Service water
  • Fire Water
Commissioning
  • Labour for commissioning of all plant  systems
Key Elements
  • Location constraints